Sheet E-001 · Construction Cost Estimator · Issued for hire
Valerian
Gadua
Quantity takeoffs pulled from the drawing's own geometry, not traced by hand. Backed by ten years on site, watching what actually gets built.
See 10 real estimates $1.98M totalEach opens as its own sheet, with the full estimate and the Excel file
Live takeoff
Flooring · Div 09 65 19 · click a tile to toggle its layer
North Macon Park Recreation Center, Macon GA. A public 100% CD set, 44 sheets. Accent bands are computed from the dimensions written on the sheet and cross-checked against the PDF's vector geometry; field tile is the schedule remainder. Open scope questions go to the architect as RFIs. Order quantities carry 5% waste on VCT and 10% on porcelain.
Career, dimensioned
2012 – present · chained left to right
Technical Lead & Estimator · Construction Georgia
Runs the company's whole technical side on contract: construction and renovation methods, crew and client support, estimates and tenders. Projects from houses and apartment fit-outs to multi-storey buildings, $100K to $1M+. Bid on a 12-storey residential tower (~$1M). Built the company's estimating software along the way.
Deputy Project Manager, Quality Control · AMN LLC
Led QC for finishing scopes across multi-building projects: finishes, turnkey apartments, masonry, ventilated and wet facades. Checked contractors' completed-work quantities before every payment.
Site Engineer · SSK LLC
Supervision from excavation to commissioning. Prepared, verified and adjusted local cost estimates and kept the estimate register.
Site Engineer · Atomik, DialogFormStroy
Technical supervision, executive documentation, subcontractor QC and stage acceptance. Civil Engineer, Military Technical University, 2011.
Built & run myself
Software in daily use, not side projects
Vector takeoff toolchain
Reads quantities from PDF vector geometry, splits finish layouts by fill color, exports Excel by CSI division and DXF. It produced the takeoff above.
Sample on requestEstimate tracker
Production web app: clients follow estimate status and revisions through shareable links, with Telegram notifications.
Private · client linksConstruction Georgia site
Three languages, 75+ project portfolio, an estimate-audit service and an interactive 3D cross-section of wall and floor build-ups.
constructiongeorgia.ge ↗Tender monitor & materials shop
A daily pipeline filtering public tenders by trade, and a materials catalog built from supplier PDFs with a Telegram ordering bot.
shop ↗Scope schedule
What I take off, by CSI MasterFormat division
| Division | Scope | Typical items | Units |
|---|---|---|---|
| 03 00 00 | Concrete | Footings, foundation walls, slabs on grade, rebar by schedule | CY · SF · LB |
| 04 00 00 | Masonry | CMU walls and partitions, lintels, bond beams | SF · EA · LF |
| 07 00 00 | Thermal & moisture | Waterproofing, ventilated and wet facades, insulation | SF · SQ |
| 09 00 00 | Finishes | Flooring split by color, paint by wall and elevation, GWB, ACT ceilings, base | SF · LF · SY |
| — | Software | Bluebeam Revu, own vector takeoff tools, Excel, AutoCAD outputs, Python | — |
Sheet index · real estimates
Priced documents from real projects · client data removed
| Sheet | Project | Type | Total, USD |
|---|
Prices converted from Georgian lari at the National Bank of Georgia rate 1 USD = 2.6074 GEL (22 Sep 2026). Quantities in metric units, as estimated.